BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Facilities Management Office - ECPv5.16.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Facilities Management Office
X-ORIGINAL-URL:https://fmo.hksyu.edu
X-WR-CALDESC:Events for Facilities Management Office
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:UTC
BEGIN:STANDARD
TZOFFSETFROM:+0000
TZOFFSETTO:+0000
TZNAME:UTC
DTSTART:20230101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20230515
DTEND;VALUE=DATE:20230821
DTSTAMP:20260521T193600
CREATED:20230505T080516Z
LAST-MODIFIED:20230505T080516Z
UID:1550-1684108800-1692575999@fmo.hksyu.edu
SUMMARY:Renovation work at Residential and Amenities Complex. Whole floor LG2 and gym room on LG1
DESCRIPTION:Renovation work at RA \nWhole floor LG2 and gym room on LG1\nwill be temporary close during the course of work.\nPlease accept our apology for any inconvenience that may be caused.
URL:https://fmo.hksyu.edu/event/renovation-work-at-residential-and-amenities-complex-whole-floor-lg2-and-gym-room-on-lg1/
ATTACH;FMTTYPE=application/pdf:https://fmo.hksyu.edu/wp-content/uploads/2023/05/Renovation-work-at-RA-1.pdf
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20230726
DTEND;VALUE=DATE:20231116
DTSTAMP:20260521T193600
CREATED:20230726T011753Z
LAST-MODIFIED:20230726T011903Z
UID:1591-1690329600-1700092799@fmo.hksyu.edu
SUMMARY:Renovation work at Lady Lily Shaw Hall
DESCRIPTION:35 Anniversary Plaza\nwill be temporary close during the course of work.\nPlease accept our apology for any inconvenience that may be caused.\n(Expected completion date : 15 November 2023)
URL:https://fmo.hksyu.edu/event/renovation-work-at-lady-lily-shaw-hall/
ATTACH;FMTTYPE=application/pdf:https://fmo.hksyu.edu/wp-content/uploads/2023/07/Renovation-work-1.pdf
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20230802
DTEND;VALUE=DATE:20230804
DTSTAMP:20260521T193600
CREATED:20230728T093255Z
LAST-MODIFIED:20230728T093255Z
UID:1604-1690934400-1691107199@fmo.hksyu.edu
SUMMARY:Half a Year Inspection for the Fire Services System
DESCRIPTION:2‐3 August 2023\, Fire service contractor\, “ATAL Building Services Engineering\nLimited.” will carry out the fire system testing in common area. They have\nbeen instructed to carry work permit for identification during the course of\nwork.\nFire Alarm System of whole building will be triggered intermittently\n(For real fire\, fire alarm will be triggered continually)Half a year inspection for fire system
URL:https://fmo.hksyu.edu/event/half-a-year-inspection-for-the-fire-services-system/
ATTACH;FMTTYPE=application/pdf:https://fmo.hksyu.edu/wp-content/uploads/2023/07/Half-a-year-inspection-for-fire-system-1.pdf
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20230803
DTEND;VALUE=DATE:20230804
DTSTAMP:20260521T193600
CREATED:20230728T093409Z
LAST-MODIFIED:20230728T095329Z
UID:1608-1691020800-1691107199@fmo.hksyu.edu
SUMMARY:Testing for the 10/F-12/F New Fire Services System
DESCRIPTION:3 August 2023\, Fire service contractor\, “HORNWAY Engineering Limited.” will\ncarry out the fire system testing in Research Complex. The Contactor would\nneed to access your premises or office. They have been instructed to carry\nwork permit for identification during the course of work.\nFire Alarm System of whole building will be triggered intermittently\n(For real fire\, fire alarm will be triggered continually)Testing for new fire system at Research Complex 10F-12F
URL:https://fmo.hksyu.edu/event/testing-for-the-10-f-12-f-new-fire-services-system/
ATTACH;FMTTYPE=application/pdf:https://fmo.hksyu.edu/wp-content/uploads/2023/07/Testing-for-new-fire-system-at-Research-Complex-10F-12F-1.pdf
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20230806
DTEND;VALUE=DATE:20230807
DTSTAMP:20260521T193600
CREATED:20230726T012012Z
LAST-MODIFIED:20230726T012242Z
UID:1597-1691280000-1691366399@fmo.hksyu.edu
SUMMARY:Replace communal electrical installations (Main Switch).
DESCRIPTION:Lift services will be intermittently suspended. \n更換電力總制\,升降機暫停使用
URL:https://fmo.hksyu.edu/event/replace-communal-electrical-installations-main-switch/
ATTACH;FMTTYPE=application/pdf:https://fmo.hksyu.edu/wp-content/uploads/2023/07/更換電力總制升降機暫停使用-1.pdf
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20230811
DTEND;VALUE=DATE:20231116
DTSTAMP:20260521T193600
CREATED:20230808T081309Z
LAST-MODIFIED:20230808T082424Z
UID:1633-1691712000-1700092799@fmo.hksyu.edu
SUMMARY:Scaffolding installation work and repairing work (Library Complex: 12/F B)
DESCRIPTION:Library Scaffolding work \nNoises and disruptions may be caused during the course of work.\nPlease accept our apologies for any inconvenience.
URL:https://fmo.hksyu.edu/event/scaffolding-installation-work-and-repairing-work-library-complex-12-f-b/
ATTACH;FMTTYPE=application/pdf:https://fmo.hksyu.edu/wp-content/uploads/2023/08/Library-Scaffolding-work-3.pdf
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20230811
DTEND;VALUE=DATE:20230812
DTSTAMP:20260521T193600
CREATED:20230731T021820Z
LAST-MODIFIED:20230731T022720Z
UID:1612-1691712000-1691798399@fmo.hksyu.edu
SUMMARY:Meter Replacement Notice
DESCRIPTION:J20231054 樹仁大學研究院綜合大樓 11 Aug 2023 (1)
URL:https://fmo.hksyu.edu/event/meter-replacement-notice/
ATTACH;FMTTYPE=application/pdf:https://fmo.hksyu.edu/wp-content/uploads/2023/07/J20231054-樹仁大學研究院綜合大樓-11-Aug-2023-1-1.pdf
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20230814
DTEND;VALUE=DATE:20230815
DTSTAMP:20260521T193600
CREATED:20230731T022938Z
LAST-MODIFIED:20230731T022938Z
UID:1616-1691971200-1692057599@fmo.hksyu.edu
SUMMARY:Meter Replacement Notice
DESCRIPTION:J20231053 樹仁大學宿舍文康大樓 14 Aug 2023 (1)
URL:https://fmo.hksyu.edu/event/meter-replacement-notice-2/
ATTACH;FMTTYPE=application/pdf:https://fmo.hksyu.edu/wp-content/uploads/2023/07/J20231053-樹仁大學宿舍文康大樓-14-Aug-2023-1-1.pdf
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=UTC:20230814T130000
DTEND;TZID=UTC:20230814T180000
DTSTAMP:20260521T193600
CREATED:20230731T060526Z
LAST-MODIFIED:20230731T060526Z
UID:1620-1692018000-1692036000@fmo.hksyu.edu
SUMMARY:Meter Replacement Notice
DESCRIPTION:J20231052 樹仁大學圖書館綜合大樓 14 Aug 2023 (1)
URL:https://fmo.hksyu.edu/event/meter-replacement-notice-3/
ATTACH;FMTTYPE=application/pdf:https://fmo.hksyu.edu/wp-content/uploads/2023/07/J20231052-樹仁大學圖書館綜合大樓-14-Aug-2023-1-1.pdf
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=UTC:20230814T130000
DTEND;TZID=UTC:20230814T180000
DTSTAMP:20260521T193600
CREATED:20230731T060633Z
LAST-MODIFIED:20230731T060633Z
UID:1624-1692018000-1692036000@fmo.hksyu.edu
SUMMARY:Meter Replacement Notice
DESCRIPTION:J20231055 樹仁大學圖書館綜合大樓 14 Aug 2023 (1)
URL:https://fmo.hksyu.edu/event/meter-replacement-notice-4/
ATTACH;FMTTYPE=application/pdf:https://fmo.hksyu.edu/wp-content/uploads/2023/07/J20231055-樹仁大學圖書館綜合大樓-14-Aug-2023-1-1.pdf
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20230819
DTEND;VALUE=DATE:20230820
DTSTAMP:20260521T193600
CREATED:20230808T081033Z
LAST-MODIFIED:20230808T081033Z
UID:1629-1692403200-1692489599@fmo.hksyu.edu
SUMMARY:Research Complex- Testing for the 10/F-12/F New Fire Services Sy
DESCRIPTION:10F-12F fire system testing \n“HORNWAY Engineering Limited.”\nwill carry out the fire system testing in Research Complex. The Contactor\nwould need to access your premises or office. They have been instructed to\ncarry work permit for identification during the course of work.\nFire Alarm System of whole building will be triggered intermittently\n(For real fire\, fire alarm will be triggered continually)
URL:https://fmo.hksyu.edu/event/research-complex-testing-for-the-10-f-12-f-new-fire-services-sy/
ATTACH;FMTTYPE=application/pdf:https://fmo.hksyu.edu/wp-content/uploads/2023/08/10F-12F-fire-system-testing-1.pdf
END:VEVENT
END:VCALENDAR