Annual inspection for fire system LC and Lily Shaw Hall
8 June 2026, Fire service contractor, “HORNWAY Engineering Limited.” will carry out the fire system testing in Library Complex and Lady Lily Shaw Hall.
The Contractor would need to access common area or offices. They have been instructed to carry a work permit for identification during the course of work.
Fire Alarm System of whole building will be triggered intermittently (For real fire, fire alarm will be triggered continually)